CE marking machinery: how to get ready for the Machinery Regulation

Picture of Anders m. Damgren

Anders m. Damgren

Head of Safety & Documentation

CE marking of machinery is an ongoing process that often intensifies at the end of the development cycle, right when everyone is busy building, testing and delivering. From 20 January 2027, the Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive 2006/42/EC, and machinery placed on the EU market from that date must meet the regulation’s requirements. The date is fixed. The backlog in the technical file rarely is.

Table of contents

What CE marking machinery actually involves

The CE mark is the end point of a documented process. Before the mark goes on the machine, four things need to be in place:

The engineering itself is typically done by the time the CE task comes to us. What is missing is getting the knowledge out of the design engineers’ heads and into a file that holds up. That is writing and structuring work, plus validation that the documentation matches the machine actually standing on the floor.

Before the mark goes on

  1. Risk assessment
  2. Technical file
  3. Standards mapping
  4. Instructions and declaration of conformity

CE

What the Machinery Regulation changes from January 2027

The Machinery Regulation (EU) 2023/1230 applies from 20 January 2027 and replaces the Machinery Directive from the same date. As a regulation, it applies directly in every EU country without national implementation. There is no transition arrangement after the cut-off: machinery placed on the market from 20 January 2027 must meet the new requirements.

The changes that matter most to machine builders:

For most existing machine models, the task is to update the risk assessment, the technical file and the declarations, and to review how control software and safety functions are documented. It is documentation work, and it has to be done per machine model.

Why CE work piles up at machine builders

CE work has an inconvenient profile: it arrives in lumps. The risk assessment should run alongside the design work, but in practice it is often pushed back while the machine is being designed. Then there is far too much to do in the final weeks before delivery, when the documentation competes with FAT, assembly and shipping for the same people.

It is also work that design engineers rarely prioritise. A mechanical engineer would rather solve the next design problem than fill in risk assessment sheets, and it is hard to blame them. The result is technical files written late, written fast, and written by people already moving on to the next project.

At most OEMs, nobody owns the task either. A full-time position for CE and compliance is hard to justify when the need swings from zero to acute over the year. So the responsibility lands with the QA or QHSE manager, whose calendar is already full.

Would you rather fill a permanent position? See our technical recruitment, or read how to write job requirements for a technical role and how to assess technical candidates.

With a fixed cut-off in January 2027, that model becomes a problem. The backlog has to be cleared before a date that will not move, and in the final months before the deadline there will be competition for people who can do the work.

What an interim CE specialist takes over

An interim CE specialist takes over the part of the work that does not require design knowledge, and structures the part that does:

Validation tasks, such as verifying that protective measures are implemented as described, sit with the same profile or with a validation engineer.

The specialist joins your team part time or full time, for exactly as long as the task requires. You see candidate profiles within 24 to 72 hours, the specialist is employed by us, and we carry salary, insurance and compliance. If the match does not work, we replace the person within 10 days.

The profile is one of several you can bring in as a consultant engineer, and it is part of PS Engineering’s catalogue of interim engineers and project managers.

What should be in place before January 2027

There is enough time, if the work starts now. A realistic plan for the last months of 2026:

Before 20 January 2027

Now

  1. Overview of the model range
  2. Gap analysis per model
  3. Documentation format
  4. Safety functions and software
  5. Capacity plan

20 January 2027

The Machinery Regulation applies

Contact us

If you have machine models going to market after January 2027 and a documentation backlog that keeps growing, talk to us. We will find a CE or compliance specialist who matches your machine type, and you will see the first profiles within 24 to 72 hours. Contact us to discuss your project.

FAQ

The Machinery Directive 2006/42/EC had to be implemented in national law in each EU country. The Machinery Regulation (EU) 2023/1230 applies directly and identically in all member states from 20 January 2027. On content, the regulation adds requirements on software with safety functions and protection of control systems against manipulation, among other things, and it opens for digital documentation.

The regulation applies to machinery placed on the EU market from 20 January 2027. Machines already placed on the market under the Machinery Directive do not need to be re-certified. If you substantially modify an existing machine, however, it may need to be assessed as a new machine.

Yes. EN ISO 12100 is the established method for machinery risk assessment and the foundation of the technical file. Keep an eye on which standards are harmonised under the regulation, and review your standards mapping when the lists are updated. Also note that a new version of ISO 12100 is on the way. It is already available as a draft, but there is no expected publication date yet.

Yes, the regulation allows digital delivery of the instructions and the EU declaration of conformity. The customer can still demand a paper copy, so the format has to support both.

You see candidate profiles within 24 to 72 hours of the need being defined, and start-up typically happens within a few days. The specialist is employed by us, so you skip the hiring process.

Yes. Many CE and documentation tasks run on two or three days a week alongside your own team. Part of the work can be done remotely, while risk assessment sessions and verification at the machine usually require presence.

Then we replace the specialist within 10 days. We carry the employment, the salary, the insurance and the compliance, so your only task is to judge whether the work is being delivered.

Are you struggling to find qualified workforce for your project?

Fill our form and and receive a call within 24 hours.

We respect your privacy and will only use your personal data to administer your account and provide requested products/services. We may contact you about our products/services and other content of interest. Please indicate below if you consent to being contacted.

Opt-out anytime. See our Privacy Policy for details on how to unsubscribe and how we protect your privacy. By submitting, you allow Plant supervision to process your info for requested content. By clicking submit below, you consent to allow Plant supervision to store and process the personal information submitted above to provide you the content requested.