CE marking of machinery is an ongoing process that often intensifies at the end of the development cycle, right when everyone is busy building, testing and delivering. From 20 January 2027, the Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive 2006/42/EC, and machinery placed on the EU market from that date must meet the regulation’s requirements. The date is fixed. The backlog in the technical file rarely is.
Table of contents
What CE marking machinery actually involves
The CE mark is the end point of a documented process. Before the mark goes on the machine, four things need to be in place:
- Risk assessment. A systematic review of the machine's hazards across its whole lifecycle, typically to EN ISO 12100, the harmonised standard for machinery risk assessment. The result feeds into the technical documentation.
- Technical file. Drawings, calculations, test reports and a description of protective measures, compiled and structured so it can be handed over if the authorities ask for it.
- Mapping against harmonised standards. Which standards were applied, where the design deviates from them, and how the requirements are met by other means where it does.
- Instructions and the EU declaration of conformity. The declaration is the legal document in which the manufacturer takes responsibility for the machine meeting the requirements.
The engineering itself is typically done by the time the CE task comes to us. What is missing is getting the knowledge out of the design engineers’ heads and into a file that holds up. That is writing and structuring work, plus validation that the documentation matches the machine actually standing on the floor.
Before the CE mark goes on
- Risk assessment
- Technical file
- Standards mapping
- Instructions and declaration of conformity
CE
What the Machinery Regulation changes from January 2027
The Machinery Regulation (EU) 2023/1230 applies from 20 January 2027 and replaces the Machinery Directive from the same date. As a regulation, it applies directly in every EU country without national implementation. There is no transition arrangement after the cut-off: machinery placed on the market from 20 January 2027 must meet the new requirements.
The changes that matter most to machine builders:
- Digital documentation. The instructions and the EU declaration of conformity may be supplied digitally. The customer can still demand a paper copy.
- Software with safety functions. Software that performs a safety function is treated as a safety component and falls under the requirements on the same footing as physical components.
- Protection against manipulation. Control systems must withstand foreseeable attempts at manipulation from outside, so an IT attack cannot put safety functions out of action.
For most existing machine models, the task is to update the risk assessment, the technical file and the declarations, and to review how control software and safety functions are documented. It is documentation work, and it has to be done per machine model.
Why CE work piles up at machine builders
CE work has an inconvenient profile: it arrives in lumps. The risk assessment should run alongside the design work, but in practice it is often pushed back while the machine is being designed. Then there is far too much to do in the final weeks before delivery, when the documentation competes with FAT, assembly and shipping for the same people.
It is also work that design engineers rarely prioritise. A mechanical engineer would rather solve the next design problem than fill in risk assessment sheets, and it is hard to blame them. The result is technical files written late, written fast, and written by people already moving on to the next project.
At most OEMs, nobody owns the task either. A full-time position for CE and compliance is hard to justify when the need swings from zero to acute over the year. So the responsibility lands with the QA or QHSE manager, whose calendar is already full.
Would you rather fill a permanent position? See our technical recruitment, or read how to write job requirements for a technical role and how to assess technical candidates.
With a fixed cut-off in January 2027, that model becomes a problem. The backlog has to be cleared before a date that will not move, and in the final months before the deadline there will be competition for people who can do the work.
What an interim CE specialist takes over
An interim CE specialist takes over the part of the work that does not require design knowledge, and structures the part that does:
- The risk assessment runs partly as working sessions with the design engineers. They supply the knowledge about the machine; the specialist drives the method and writes the documentation to EN ISO 12100.
- The technical file is compiled, structured and held up against the regulation's requirements, including the new points on software and safety functions.
- The standards mapping is reviewed, so applied standards and deviations are documented per model.
- Instructions and declarations of conformity are produced by technical writers, who can also set up the structure for digital delivery.
Validation tasks, such as verifying that protective measures are implemented as described, sit with the same profile or with a validation engineer.
The specialist joins your team part time or full time, for exactly as long as the task requires. You see candidate profiles within 24 to 72 hours, the specialist is employed by us, and we carry salary, insurance and compliance. If the match does not work, we replace the person within 10 days.
The profile is one of several you can bring in as a consultant engineer, and it is part of PS Engineering’s catalogue of interim engineers and project managers.
What should be in place before January 2027
There is enough time, if the work starts now. A realistic plan for the last months of 2026:
- Get an overview of the model range. Which machine models will be placed on the market after 20 January 2027? All of them need to be assessed against the regulation.
- Gap analysis per model. Hold the existing technical file up against the regulation's requirements. The gaps often sit in the risk assessment's coverage of software and in the documentation of how control systems are protected against manipulation.
- Decide the documentation format. Digital delivery of instructions requires a structure that can be maintained per machine and per version.
- Review safety functions and software. Map which functions are performed by software, and how they are documented today.
- Make a capacity plan. Settle who writes, reviews and approves, and when. If the internal hours will not stretch, now is the time to bring in a CE marking consultant and extra hands, not December.
Before 20 January 2027
Now
- Overview of the model range
- Gap analysis per model
- Documentation format
- Safety functions and software
- Capacity plan
20 January 2027
The Machinery Regulation applies
Contact us
If you have machine models going to market after January 2027 and a documentation backlog that keeps growing, talk to us. We will find a CE or compliance specialist who matches your machine type, and you will see the first profiles within 24 to 72 hours. Contact us to discuss your project.
FAQ
The Machinery Directive 2006/42/EC had to be implemented in national law in each EU country. The Machinery Regulation (EU) 2023/1230 applies directly and identically in all member states from 20 January 2027. On content, the regulation adds requirements on software with safety functions and protection of control systems against manipulation, among other things, and it opens for digital documentation.
The regulation applies to machinery placed on the EU market from 20 January 2027. Machines already placed on the market under the Machinery Directive do not need to be re-certified. If you substantially modify an existing machine, however, it may need to be assessed as a new machine.
Yes. EN ISO 12100 is the established method for machinery risk assessment and the foundation of the technical file. Keep an eye on which standards are harmonised under the regulation, and review your standards mapping when the lists are updated. Also note that a new version of ISO 12100 is on the way. It is already available as a draft, but there is no expected publication date yet.
Yes, the regulation allows digital delivery of the instructions and the EU declaration of conformity. The customer can still demand a paper copy, so the format has to support both.
You see candidate profiles within 24 to 72 hours of the need being defined, and start-up typically happens within a few days. The specialist is employed by us, so you skip the hiring process.
Yes. Many CE and documentation tasks run on two or three days a week alongside your own team. Part of the work can be done remotely, while risk assessment sessions and verification at the machine usually require presence.
Then we replace the specialist within 10 days. We carry the employment, the salary, the insurance and the compliance, so your only task is to judge whether the work is being delivered.